The preparation of putting greens should always be done considerably in advance of seeding, to allow ample time for the sinking of soil and the smoothing over above the drains. If it is intended to sow greens in the fall. it is best to construct them in the early summer.
Donald Ross
from Golf Has Never Failed Me
PG gravel layer being installed |
No comments:
Post a Comment