The large drainage line that runs through #7 fairway has needed replacing for many years ... and now we're finally on it. We're changing from old 18" clay tile to 12" solid plastic and at the same time adding better backfill material.
This will help the playability of the landing zone in #7 and make it easier to mow on wet days.
Thanks for digging up a memory. I had my hands on that old 18" clay tile, either were you are in the picture or nearby. Early spring, I had to connect the good pieces with tile and zip it back up quickly for the US Open. Mark Frever, 1996 Intern
ReplyDelete