The project on #6 fairway South was finished yesterday. The sod lines will require water over the summer as the drain lines were filled with straight sand. Using only sand in the trench lines assures us that water will infiltrate and percolate at a high rate.
Thursday, April 14, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment