The new overflow structure for #12 pond was installed today. This will allow us to control the water level inside the steel wall on holes 12 and 13. With the ability to lower this water level, the area in front of #14 and #16 tee will drain better in the winter and spring.
Tuesday, May 4, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment